EMPLOYEE LOGIN


Columbia City Waste Water Treatment Plant Upgrade

JOB LOCATION

 1171 Line St., Columbia City, In

SCOPE OF WORK

  • Erosion Control
  • Strip and Replace Topsoil
  • Underground Process Piping
  • Manhole Installation
  • Excavating for Site Utilities
  • Footing and Foundation Excavation
  • Roadway Prep
  • Site Grading
  • Structure excavating

REFERENCES

  • Josh Hess, Project Manager
  • Corporate Construction, Inc., General Contractor

 

testimonial image

Jay Geiger and his team have risen beyond the challenge, to work whenever possible through inclement weather.

David Bocklan, Vice President
T.W. Frierson Contractor, Inc.