EMPLOYEE LOGIN


Columbia City Waste Water Treatment Plant Upgrade

JOB LOCATION

 1171 Line St., Columbia City, In

SCOPE OF WORK

  • Erosion Control
  • Strip and Replace Topsoil
  • Underground Process Piping
  • Manhole Installation
  • Excavating for Site Utilities
  • Footing and Foundation Excavation
  • Roadway Prep
  • Site Grading
  • Structure excavating

REFERENCES

  • Josh Hess, Project Manager
  • Corporate Construction, Inc., General Contractor

 

testimonial image

Jay Geiger and his team have risen beyond the challenge, to work whenever possible through inclement weather.

-1" OR 2+68-68-1=0+0+0+1 --
T.W. Frierson Contractor, Inc.